Planning horizon
Year 1Year 2Year 3
September 2026 — September 2029 · Proposed

Proposed work plan

MCAP leads implementation and federal reporting. Heartland Solutions leads evaluation. The nine participating states and three tribes inform training priorities and pilot selection across five focus areas.

The first 90 days cover the needs assessment, training plan, lab charters and evaluation plan. The dates below assume a September 30, 2026 start and are pending award confirmation.

Download the complete OCS work plan (Word)

Objectives and evidence

1. Build capacity through tailored training

Provide CSBG states, territories, tribes, state associations, and eligible entities with capacity-building support tailored to families with low incomes.

Proposed goal · By January 30, 2027, establish five Innovation Labs. Starting within six months of award, deliver at least 12 targeted learning activities annually (36 over three years). At least 80% of responding organizations will report increased knowledge or capacity to apply interventions that support earned income, employment stability, or asset development.

Year 1

Activity 1.1.1 · 2026-09-30 to 2026-12-28

MCAP project director and manager hire staff, onboard partners, assess needs using local assessments, OCS data and partner feedback, and set training priorities. Use recent ACSI feedback on linkages, TTA and communication alongside OCS survey items and local assessments.

Evidence · Staffing and partner roster, baseline needs assessment and T&TA plan. Narrative 1.1–1.2. Retain baseline definitions and record the source of each priority.

Activity 1.1.2 · 2026-09-30 to 2027-09-29

Recruit members in all five focus areas, engage subject matter experts and charter labs. Convene quarterly to review emerging needs. Assign a subject matter expert to each lab.

Evidence · Five charters, workplans, learning agendas, attendance and quarterly minutes. Narrative 1.2. Review collaboration annually using the Working Together Survey.

Activity 1.1.3 · 2026-12-29 to 2027-09-29

MCAP and experts deliver scheduled and on-demand coaching, webinars and peer learning. Log requests, route by need and survey participants after delivery. Log planned and ad hoc requests, delivery mode, jurisdiction, respondent unit and follow-up on use.

Evidence · At least 12 activities annually and 36 overall. Track attendance, response rate and percentage reporting increased capacity. Narrative 1.3. Monitor reach monthly across nine states and three tribes. Distinguish respondent gain from organizational application.

Year 2

Activity 1.2.2 · 2027-09-30 to 2028-09-29

Convene the five labs quarterly, maintain membership and review learning agendas.

Evidence · Quarterly lab records and annual collaboration and SME survey.

Activity 1.2.3 · 2027-09-30 to 2028-09-29

Deliver at least 12 targeted opportunities this year and follow up on application.

Evidence · Annual training tally, jurisdiction coverage and post-training application evidence. Confirm Year 3 volume: Table 5 specifies more than 12 annually, while Table 2 sets at least 12 annually.

Year 3

Activity 1.3.2 · 2028-09-30 to 2029-09-29

Convene the five labs quarterly, maintain membership and review learning agendas.

Evidence · Quarterly lab records and annual collaboration and SME survey.

Activity 1.3.3 · 2028-09-30 to 2029-09-29

Deliver at least 12 targeted opportunities this year and follow up on application.

Evidence · Annual training tally, jurisdiction coverage and post-training application evidence.

2. Test community strategies

Advance community-level strategies.

Proposed goal · By September 29, 2029, launch at least five local or regional pilots. Review every pilot, document progress toward implementation targets for at least 80%, and provide replication guidance for every intervention selected for scale. Produce at least five replication-ready resources by project end.

Year 1

Activity 2.1.4 · 2026-12-29 to 2027-09-29

Labs and implementation partners select sites, agree baselines and test interventions across economic mobility, education, workforce, transportation and safe, stable housing. Incorporate substance use prevention or recovery. Document selection, common baseline, target, responsible agency and family or service outcome.

Evidence · Selection rubric, site plans and at least five pilot launches. Record barriers, target population and intended family outcomes. Narrative 2.1–2.2. Maintain a profile for every pilot.

Activity 2.1.5 · 2026-12-29 to 2027-09-29

Evaluator, labs and experts conduct quarterly rapid-cycle reviews. Compare implementation with baseline, test adaptations and assess readiness to replicate. Heartland collects implementation and outcome data every six weeks with sites. Labs review quarterly.

Evidence · One structured review per pilot, measurable progress in at least 80%, replication decision for each completed pilot and guidance for each selected practice. Narrative 2.2–2.3. Assess each active pilot annually. Record progress, target attainment, fidelity, adaptation and next decision separately.

Activity 2.1.6 · 2026-12-29 to 2027-09-29

Experts coach sites on cross-focus topics at least semiannually. Integrate substance use disorder learning into labs and produce a field resource. Include prevention, intervention and recovery across focus areas.

Evidence · Learning records, pilot findings and at least one substance use disorder resource in the repository. Narrative Table 5 bonus activities. Document at least two SUD learning activities in each of Years 2 and 3, and one SUD strategy piloted and disseminated.

Year 2

Activity 2.2.4 · 2027-09-30 to 2028-09-29

Test additional selected pilots and update their implementation plans.

Evidence · Pilot profiles and launch register toward five cumulative launches.

Activity 2.2.5 · 2027-09-30 to 2028-09-29

Continue six-week data collection, quarterly adaptation decisions and annual reviews.

Evidence · Review logs, baseline comparisons and replication decisions for completed pilots. Track at least five replication-ready resources across the project and link each to its pilot evidence.

Activity 2.2.6 · 2027-09-30 to 2028-09-29

Offer cross-focus TTA at least semiannually and document SUD learning and application.

Evidence · SUD learning records, implementation notes and dissemination evidence.

Year 3

Activity 2.3.4 · 2028-09-30 to 2029-09-29

Test additional selected pilots and update their implementation plans.

Evidence · Pilot profiles and launch register toward five cumulative launches.

Activity 2.3.5 · 2028-09-30 to 2029-09-29

Continue six-week data collection, quarterly adaptation decisions and annual reviews.

Evidence · Review logs, baseline comparisons and replication decisions for completed pilots.

Activity 2.3.6 · 2028-09-30 to 2029-09-29

Offer cross-focus TTA at least semiannually and document SUD learning and application.

Evidence · SUD learning records, implementation notes and dissemination evidence.

3. Use partnerships and data to improve services

Invest in cross-community partnerships to support data-driven decision-making and infrastructure.

Proposed goal · By month six, track all pilots in a shared portfolio. Open the Knowledge Repository by September 29, 2027, and disseminate at least five substantive resources by September 29, 2029. Use partner reviews to improve service delivery, reporting and compliance. By project end, identify at least three continuation strategies and initiate at least one, subject to reconciliation with Tables 5 and 6.

Year 1

Activity 3.1.7 · 2026-09-30 to 2027-09-29

Evaluator and MCAP establish the evaluation plan, portfolio profiles and electronic dashboard. Reconcile missing or inconsistent data with sites and review findings with partners. The project manager updates monitoring data monthly. Heartland and the coordinator check completeness. MCAP reviews finances with its fiscal consultant. During the first 90 days, draft pilot selection and measurement protocols, portfolio profile standards and the rapid-cycle review framework.

Evidence · Evaluation plan within 90 days. Profiles for 100% of pilots, quarterly data checks and semiannual portfolio reviews. Track reporting exceptions and corrective actions. Narrative 3.1. Document monthly evaluator meetings, semiannual portfolio reviews and annual evaluation plan updates. Track spending by activity and funding stream, reconcile source records and flag exceptions for fiscal review to reduce the risk of fraud, waste and abuse.

Activity 3.1.8 · 2026-10-31 to 2027-09-29

MCAP and partners launch the repository and publish implementation guides through webinars, peer learning, conferences and the learning management system. Coordinate design with OCS and document agreement before external dissemination. Retain MCAP-maintainable copies and document reuse rights. In the first 90 days, draft the repository plan and identify expected products with labs and subject matter experts.

Evidence · Repository live by September 29, 2027. Disseminate at least five resources by project end and showcase work at five conferences annually. Narrative 3.2. Record release version, review date, channel and audience. Table 5 plans at least two products in each of Years 2 and 3.

Activity 3.1.9 · 2026-09-30 to 2027-09-29

MCAP and partners identify components to continue, develop peer leadership and assign owners to continuation strategies. Plan for partner-led labs, long-term repository ownership and maintenance. Begin sustainability planning during launch. Table 5 anticipates one strategy initiated in Year 1.

Evidence · Plan with at least three strategies and evidence of initiation. Confirm timing and number implemented with OCS. Narrative 3.3, Tables 5–6. Track strategies identified, initiated and implemented separately.

Year 2

Activity 3.2.7 · 2027-09-30 to 2028-09-29

Update the dashboard monthly and synthesize pilot findings twice this year.

Evidence · Monthly monitoring records, two portfolio reviews and annual evaluation update.

Activity 3.2.8 · 2027-09-30 to 2028-09-29

Maintain the repository and disseminate at least two substantive resources this year.

Evidence · Resource register, usage evidence and conference records.

Activity 3.2.9 · 2027-09-30 to 2028-09-29

Prioritize continuation strategies with partners and document implementation.

Evidence · Continuation log with strategy, owner and stage.

Year 3

Activity 3.3.7 · 2028-09-30 to 2029-09-29

Update the dashboard monthly and synthesize pilot findings twice this year.

Evidence · Monthly monitoring records, two portfolio reviews and annual evaluation update.

Activity 3.3.8 · 2028-09-30 to 2029-09-29

Maintain the repository and disseminate at least two substantive resources this year.

Evidence · Resource register, usage evidence and conference records.

Activity 3.3.9 · 2028-09-30 to 2029-09-29

Finalize the sustainability plan with partners, document initiation and transfer maintenance responsibilities.

Evidence · Continuation log with strategy, owner and stage.

4. Support state and tribal consultation

Proactively provide states and tribes a forum for mutual consultation and guidance, to improve shared administrative operations.

Proposed goal · Proposed for tribal partner and OCS review: Within 90 days invite all three named tribes to identify shared administrative priorities. Offer a quarterly state–tribal consultation opportunity thereafter and record agreed follow-up actions through Year 3.

Year 1

Activity 4.1.10 · 2026-09-30 to 2026-12-28

MCAP invites the Ponca Tribe of Nebraska, Klamath Tribes and Confederated Tribes of Grand Ronde to identify priorities. Coordinate with the tribal capacity-building TTA grantee. Invite each tribe to identify its own priorities, preferred process and documentation practices.

Evidence · Document invitations, partner-preferred consultation methods and jointly identified priorities. Narrative 1.1–1.2 and Table 5. Partner participation is recorded when confirmed.

Activity 4.1.11 · 2026-12-29 to 2027-09-29

Proposed: Invite state and tribal partners to jointly select administrative questions, convene on an agreed schedule and review actions at the next meeting. Respect sovereignty and identify shared administrative topics with willing partners.

Evidence · Partner-approved agendas and action log with owners and follow-up dates. Confirm frequency, documentation permissions and indicators with partners. Cadence and documentation are subject to partner consultation.

Year 2

Activity 4.2.11 · 2027-09-30 to 2028-09-29

Continue the partner-agreed consultation process and follow up on actions.

Evidence · Agendas and agreed follow-up, subject to partner permission.

Year 3

Activity 4.3.11 · 2028-09-30 to 2029-09-29

Continue the partner-agreed consultation process and follow up on actions.

Evidence · Agendas and agreed follow-up, subject to partner permission.

Deliverables and reporting schedule
Needs assessment and T&TA delivery plan

Day 90 · Proposed review timing

Activities 1.1.1, 4.1.10
Innovation Lab charters and learning agendas

Day 90 · Proposed review timing

Activities 1.1.2, 1.2.2, 1.3.2
Training materials, participation and feedback summary

Annually · Proposed review timing

Activities 1.1.2, 1.2.2, 1.3.2, 1.1.3, 1.2.3, 1.3.3, 2.1.6, 2.2.6, 2.3.6
Pilot protocol, implementation reviews and replication guidance

At selection, review and closeout · Proposed review timing

Activities 2.1.4, 2.2.4, 2.3.4, 2.1.5, 2.2.5, 2.3.5
Evaluation plan, dashboard and portfolio review summaries

Day 90 plan, month 6 portfolio, then semiannual reviews · Proposed review timing

Activities 3.1.7, 3.2.7, 3.3.7
Knowledge Repository and implementation resources

Repository by Sep 29, 2027. Resources by Sep 29, 2029. · Proposed review timing

Activities 2.1.6, 2.2.6, 2.3.6, 3.1.8, 3.2.8, 3.3.8
Sustainability plan and initiation record

Year 1 draft, Year 3 final · Proposed review timing

Activities 3.1.9, 3.2.9, 3.3.9
Consultation priorities and agreed follow-up record

Day 90, then agreed meeting cycle · Proposed review timing

Activities 4.1.10, 4.1.11, 4.2.11, 4.3.11
Quarterly TTA Tracking Form

Quarterly · MCAP confirms the current form and first due date with OCS.

Activities 3.1.7, 3.2.7, 3.3.7
ACF-OGM-PPR and SF-425 FFR

April 30 and October 30 each budget year · MCAP submits performance and financial reports. Fiscal consultant reconciles financial inputs. Final reports due 90 days after expiration per template.

Activities 3.1.7, 3.2.7, 3.3.7
OCS work plan and external products

Before submission or external release · MCAP obtains OCS input on design and documents review and agreement. Submit the versioned work plan through GrantSolutions and send the courtesy notice per Section III.

Activities 3.1.8, 3.2.8, 3.3.8
Grant narrative crosswalk · 9 objectives and 38 tasks

File 1 Tables 2 and 5 connect to the numbered annual activities above. Source timing and milestones are reproduced for comparison with the review draft.

Table 2 · Narrative objectives
  1. Objective 1.1

    Within 90 days of award, complete an initial assessment of T&TA needs and capacity-building priorities and use the findings to establish/refine project priorities and inform subject matter experts (SMEs) and pilot activities.

    Section IV · 1.1.1, 4.1.10
  2. Objective 1.2

    Beginning within 90 days of award, establish Innovation Labs that meet quarterly to participate in peer learning, analyze emerging needs and trends, review data, and engage in co-design activities with SME’s to select core focus area interventions and review innovations.

    Section IV · 1.1.2, 1.2.2, 1.3.2, 4.1.11, 4.2.11, 4.3.11
  3. Objective 1.3

    Beginning within six months of award, provide at least 12 targeted T&TA and peer-learning opportunities annually, resulting in at least 36 learning activities over the three-year project period, with at least 80% of participating organizations responding to post-activity assessments reporting increased knowledge or capacity to apply the interventions addressed.

    Section IV · 1.1.3, 1.2.3, 1.3.3
  4. Objective 2.1

    Beginning within six months of award, engage Innovation Labs in strategy-development activities and launch at least five innovation pilots during the three-year project period, with each pilot addressing an identified capacity-building or service-delivery priority.

    Section IV · 2.1.4, 2.2.4, 2.3.4
  5. Objective 2.2

    Beginning in Year 1, test selected evidence-informed interventions in participating CoP4 implementation environments with 100% of pilots completing at least one structured implementation review and at least 80% demonstrating measurable progress toward their established implementation targets.

    Section IV · 2.1.5, 2.2.5, 2.3.5
  6. Objective 2.3

    By September 29, 2029, apply RCL and continuous-improvement (CI) methods to 100% of pilots to determine scalability and ensure that 100% of practices selected are supported by standardized implementation and replication guidance.

    Section IV · 2.1.5, 2.2.5, 2.3.5, 3.1.8, 3.2.8, 3.3.8
  7. Objective 3.1

    Beginning within six months of award, establish and maintain a CoP4 Innovation Portfolio management process that leverages technology to track, compare, and synthesize findings across 100% of innovation pilots.

    Section IV · 3.1.7, 3.2.7, 3.3.7
  8. Objective 3.2

    By September 29, 2027, establish a centralized CoP4 Knowledge Repository to organize and provide access to project-developed interventions and produce and disseminate at least five substantive resources by the end of the project period.

    Section IV · 3.1.8, 3.2.8, 3.3.8
  9. Objective 3.3

    By September 29, 2029, develop and initiate a sustainability plan that identifies at least three strategies for continuing CoP4-developed resources, partnerships, peer-learning activities, and knowledge-sharing infrastructure beyond the federal project period and initiate one sustainability strategy.

    Section IV · 3.1.9, 3.2.9, 3.3.9
Table 5 · Original work plan tasks
  1. Project launch; hire staff; announce across system, plans finalized and timeline revised

    Project Director (PD), Project Manager (PM) · Year 1 months 1 · Year 2 Update · Year 3 Sustain

    Milestone · Infrastructure in place

    Section IV · 1.1.1
  2. Establish project leadership structure, partners

    PD, PM. · Year 1 months 1 · Year 2 Review · Year 3 Sustain

    Milestone · Launch Innovation Labs

    Section IV · 1.1.1, 1.1.2, 1.2.2, 1.3.2
  3. Complete T&TA assessment, establish capacity building priorities, coordinate tribal needs with TCBTTA grantee

    MCAP, PD, PM, Innovation Labs (ILs) Evaluator (E) · Year 1 months 1, 2 · Year 2 Update · Year 3 Update

    Milestone · T&TA Assessment Completed

    Section IV · 1.1.1, 4.1.10
  4. Develop T&TA plan

    MCAP, PD,PM · Year 1 months 1, 2 · Year 2 Update · Year 3 Update

    Milestone · T&TA Plan developed

    Section IV · 1.1.1, 1.1.3, 1.2.3, 1.3.3
  5. Identify and prioritize shared priorities across the CoP4 jurisdictions/tribes

    MCAP, SMEs, PM, PD, ILs · Year 1 months 2 · Year 2 Review/ Update · Year 3 Review/ Update

    Milestone · ILs established

    Section IV · 1.1.1, 4.1.10
  6. Identify and engage SMEs

    MCAP · Year 1 months 3 · Year 2 Ongoing · Year 3 Sustain

    Milestone · SME integrated into CoP4

    Section IV · 1.1.2, 1.2.2, 1.3.2
  7. Establish ILs around five focus areas, develop membership charters, learning agendas, workplans

    MCAP, PM, PD, ILs · Year 1 months 3 · Year 2 Ongoing · Year 3 Sustain

    Milestone · ILs in place

    Section IV · 1.1.2, 1.2.2, 1.3.2
  8. Establish Innovation Portfolio Framework methodology and Knowledge Repository Plan

    MCAP, ILs, SMEs, E · Year 1 months 2, 3 · Year 2 Review · Year 3 Publish

    Milestone · Framework submitted for review to ILs

    Section IV · 3.1.7, 3.2.7, 3.3.7, 3.1.8, 3.2.8, 3.3.8
  9. Identify expected products

    MCAP, SMEs, ILs · Year 1 months 3 · Year 2 Update Yr. 2 · Year 3 Update Yr. 3

    Milestone · At least 5 by 9/2029

    Section IV · 3.1.8, 3.2.8, 3.3.8
  10. Develop/refine evaluation plan, measures of effectiveness and outcomes

    Evaluator, ILs, Project staff, SMEs · Year 1 months 2, 3 · Year 2 Update · Year 3 Update

    Milestone · Evaluation and RCL/CI process

    Section IV · 3.1.7, 3.2.7, 3.3.7
  11. Launch IL meetings and engage in peer learning, emerging needs, data review

    MCAP, PD, PM, ILs, SMEs · Year 1 months 4–5, 6–7, 8–9, 10–12 · Year 2 Quarterly · Year 3 Quarterly

    Milestone · At least 12 meetings over 3 yrs.

    Section IV · 1.1.2, 1.2.2, 1.3.2
  12. Provide specialized T&TA

    MCAP, ILs, SMEs · Year 1 months 4–5, 6–7, 8–9, 10–12 · Year 2 Monthly · Year 3 >12 annually

    Milestone · At least 36 targeted T&TA activities

    Section IV · 1.1.3, 1.2.3, 1.3.3
  13. Provide SME consultation

    MCAP, SMEs, ILs · Year 1 months 4–5, 6–7, 8–9, 10–12 · Year 2 Monthly · Year 3 Ongoing

    Milestone · SME expertise deployed

    Section IV · 1.1.2, 1.2.2, 1.3.2, 1.1.3, 1.2.3, 1.3.3
  14. Peer learning, webinars, implementation support and learning resources launched

    MCAP, SMEs, ILs · Year 1 months 6–7, 8–9, 10–12 · Year 2 Ongoing · Year 3 Ongoing

    Milestone · Peer learning implementation support

    Section IV · 1.1.3, 1.2.3, 1.3.3
  15. Assess T&TA effectiveness and knowledge capacity/application, implementation and service delivery

    E, MCAP, SMEs · Year 1 months 6–7, 8–9, 10–12 · Year 2 Ongoing · Year 3 Final Analysis

    Milestone · ≥80% of respondents report increased knowledge or capacity to apply interventions

    Section IV · 1.1.3, 1.2.3, 1.3.3
  16. Establish and deploy ILs and framework to select pilots (selection criteria, implementation plans)

    MCAP, E, ILs · Year 1 months 6–7, 8–9, 10–12 · Year 2 Utilize / Refine · Year 3 Utilize / Complete

    Milestone · Common pilot framework used for 100% of pilots

    Section IV · 2.1.4, 2.2.4, 2.3.4
  17. Establish Innovation Portfolio Management process and standardized Innovation Portfolio Profiles

    MCAP, E · Year 1 months 4–5, 6–7 · Year 2 Utilize Ongoing · Year 3 Utilize Ongoing

    Milestone · Common pilot framework used for 100% of pilots

    Section IV · 3.1.7, 3.2.7, 3.3.7
  18. Integrate SUD focused T&TA into ILs

    MCAP, SUD SMEs, ILs · Year 1 months 4–5, 6–7, 8–9, 10–12 · Year 2 ≥2 learning activities · Year 3 ≥2 learning activities

    Milestone · SUD capacity building integrated into system

    Section IV · 2.1.6, 2.2.6, 2.3.6
  19. Integrate SUD information into pilots,

    MCAP, SUD SMEs, ILs, E · Year 1 months 6–7, 8–9, 10–12 · Year 2 Pilot / Measure / RCL · Year 3 Complete / Share

    Milestone · 100% of pilots reflect SUD, prevention/recovery

    Section IV · 2.1.4, 2.2.4, 2.3.4, 2.1.6, 2.2.6, 2.3.6
  20. Integrate pilots into Evaluation Plan

    E, MCAP, ILs · Year 1 months 4–5, 6–7, 8–9, 10–12 · Year 2 Ongoing · Year 3 Final Analysis

    Milestone · 100% of pilots included in evaluation /performance measurement

    Section IV · 2.1.5, 2.2.5, 2.3.5, 3.1.7, 3.2.7, 3.3.7
  21. Establish RCL/ CI process for innovation pilots

    MCAP, E, CoPs, SMEs · Year 1 months 4–5 · Year 2 Utilize · Year 3 Sustain

    Milestone · RCL/CI applied to 100% of pilots

    Section IV · 2.1.5, 2.2.5, 2.3.5
  22. Identify and select local or regional innovation pilot agencies

    ILs, SMEs, MCAP · Year 1 months 4–5, 6–7 · Year 2 Continue · Year 3 Complete

    Milestone · At least 5 locally or regionally informed pilots selected

    Section IV · 2.1.4, 2.2.4, 2.3.4
  23. Launch innovation pilots

    Implementation Partners, ILs · Year 1 months 6–7, 8–9, 10–12 · Year 2 Test · Year 3 Expand

    Milestone · At least 5 innovation pilots launched during project period

    Section IV · 2.1.4, 2.2.4, 2.3.4
  24. Collect performance data for 100% of pilots

    ILs, E MCAP · Year 1 months 4–5, 6–7, 8–9, 10–12 · Year 2 Quarterly · Year 3 Quarterly

    Milestone · All pilots are integrated into the project evaluation

    Section IV · 2.1.5, 2.2.5, 2.3.5, 3.1.7, 3.2.7, 3.3.7
  25. Conduct structured innovation reviews of pilots

    MCAP, E, ILs, SMEs · Year 1 months 4–5, 6–7, 8–9, 10–12 · Year 2 Quarterly · Year 3 Quarterly

    Milestone · ILs, SMEs review pilots

    Section IV · 2.1.5, 2.2.5, 2.3.5
  26. Provide T&TA related to cross-focus area topics

    ILs, SMEs, E · Year 1 months 8–9, 10–12 · Year 2 Expand · Year 3 Complete

    Milestone · At least semi-annually

    Section IV · 2.1.6, 2.2.6, 2.3.6
  27. Apply RCL/CI process and share outcome findings for process and summative evaluation

    MCAP, E, CoPs, SMEs · Year 1 months 4–5, 6–7, 8–9, 10–12 · Year 2 Share Findings · Year 3 Complete Final Findings

    Milestone · Quarterly RCL/annual evaluation

    Section IV · 2.1.5, 2.2.5, 2.3.5, 3.1.7, 3.2.7, 3.3.7
  28. Determine replication potential of piloted interventions

    MCAP, E, CoPs, SMEs · Year 1 months 6–7, 8–9, 10–12 · Year 2 Ongoing · Year 3 Complete

    Milestone · Replication-readiness determination completed for 100% of completed pilots

    Section IV · 2.1.5, 2.2.5, 2.3.5
  29. Engage in quarterly RCL/CI, fidelity monitoring

    MCAP, SMEs, ILs, Practitioners · Year 1 months 4–5, 6–7, 8–9, 10–12 · Year 2 Quarterly · Year 3 Quarterly / Final Review

    Milestone · Implementation and learning findings reviewed

    Section IV · 2.1.5, 2.2.5, 2.3.5
  30. Develop replication guidance for 100% of pilots select for replication

    MCAP, E, ILs, SMEs · Year 1 months 6–7, 8–9, 10–12 · Year 2 Ongoing · Year 3 Complete

    Milestone · 100% of interventions selected for replication have standardized implementation guidance

    Section IV · 2.1.5, 2.2.5, 2.3.5, 3.1.8, 3.2.8, 3.3.8
  31. Conduct semiannual Innovation Portfolio Reviews across all pilots

    MCAP, CoPs, SMEs, ILs · Year 1 months 6–7, 10–12 · Year 2 2 reviews · Year 3 2 reviews

    Milestone · Innovation Portfolio findings reviewed semiannually

    Section IV · 3.1.7, 3.2.7, 3.3.7
  32. Develop implementation-informed resources

    MCAP, SMEs, Practitioners, ILs · Year 1 months 4–5, 6–7, 8–9, 10–12 · Year 2 ≥2 annually · Year 3 ≥2 annually

    Milestone · Minimum of 5 substantive implementation-informed resources produced and disseminated

    Section IV · 3.1.8, 3.2.8, 3.3.8
  33. Implement multi-channel dissemination through Knowledge Repository, webinars, peer learning, LMS, communications, presentations, and network-wide activities

    MCAP, Partners, SMEs · Year 1 months 4–5, 6–7, 8–9, 10–12 · Year 2 Ongoing · Year 3 Ongoing / Disseminate

    Milestone · Resources disseminated through Repository and multiple network-wide channels

    Section IV · 3.1.8, 3.2.8, 3.3.8
  34. Feature CoP4 Innovation Lab Pilots/Resources at State Association/Tribal Conferences

    MCAP, Partners, ILs, SMEs · Year 1 months 10–12 · Year 2 Ongoing · Year 3 Ongoing

    Milestone · At least 5 conferences will showcase CoP4 project annually

    Section IV · 3.1.8, 3.2.8, 3.3.8
  35. Identify CoP4 components and infrastructure with potential for continuation beyond the award

    MCAP, Partners, E · Year 1 months 10–12 · Year 2 Assess / Prioritize · Year 3 Finalize

    Milestone · Priority components for post-award continuation identified

    Section IV · 3.1.9, 3.2.9, 3.3.9
  36. Build capacity for peer-led continuation of ILs, mentoring and implementation

    MCAP, Partners · Year 1 months 6–7, 8–9, 10–12 · Year 2 Expand · Year 3 Transition / Sustain

    Milestone · Sustainability strategies established for high-value CoP activities

    Section IV · 3.1.9, 3.2.9, 3.3.9
  37. Develop formal CoP4 Sustainability Plan identifying at least three continuation strategies

    MCAP, Partners, E · Year 1 months 6–7, 8–9 · Year 2 Finalize / Initiate · Year 3 Finalize

    Milestone · Sustainability Plan, at least 1 strategy initiated by Year-1

    Section IV · 3.1.9, 3.2.9, 3.3.9
  38. Develop and disseminate at least one implementation informed SUD capacity-building resource

    MCAP, Partners, E · Year 1 months 10–12 · Year 2 Disseminate

    Milestone · At least 1 implementation-informed SUD resource added to Knowledge Repository

    Section IV · 2.1.6, 2.2.6, 3.1.8, 3.2.8

Add record